As the core power component of energy storage systems, power conversion system (PCS) must pass complete standardized electrical performance verification for both R&D prototype validation and mass production factory inspection. Full test items include steady-state conversion efficiency test, cycle charge-discharge test under high and low voltage ranges, grid low/high voltage ride-through, frequency fluctuation and harmonic disturbance simulation, reliability verification of protection functions such as overload, short circuit and over-temperature, long-term aging loss test, as well as grid-connected compliance tests complying with domestic GB/T standards and international IEC & UL specifications.
Traditional industry testing modes bring numerous pain points for clients. Scattered procurement of multi-brand instruments leads to poor equipment compatibility. Self-built test benches require long development cycles and high labor cost. Dispersed test data cannot be automatically archived and traced. Manual detection on mass production lines results in low efficiency. Calibration, malfunction repair and software upgrade require cooperation with multiple suppliers, bringing high communication and management costs.
Bidipro launches standardized integrated automated test system for energy storage PCS. Clients do not need to assemble scattered instruments by themselves, as the complete solution is delivered as a full standardized package. Core hardware configuration includes high-power regenerative bidirectional programmable source-load machine, grid simulation power supply, high-precision power analyzer, temperature & humidity environmental simulation unit, multi-channel synchronous data acquisition industrial control module and CAN bus signal acquisition unit. We equip self-developed exclusive upper computer automation software for PCS, embedded with test templates for domestic standards and mainstream international certification standards, which can automatically generate compliant test reports with one click after testing.
The complete PCS testing solution serves three major application scenarios. The first solution is designed for energy storage enterprise R&D labs, applicable for multi-condition simulation of new prototypes and long-term reliability aging tests. Short-term instrument rental is supported, and equipment can be returned after project completion to reduce enterprise fixed asset occupation. The second solution is mass production final test bench for energy storage factories, which can connect automatic loading & unloading equipment of assembly lines. Product serial numbers are bound via QR code scanning, all test data are permanently stored in cloud to realize full production chain quality traceability, cutting single PCS test time by 60%. The third solution targets third-party energy storage testing laboratories. All equipment supports calibration by official third-party metrology institutions and can generate credible complete test data to meet certification demands for exported energy storage products.
Different from ordinary manufacturers that only sell hardware, Bidipro positions itself as a service-oriented testing brand and provides five categories of full-lifecycle implementation supporting services. Free on-site survey is offered in the early project stage; our engineers conduct field research on lab space and production line capacity planning to deliver exclusive layout and equipment configuration schemes. Secondary customized software development is available to modify automated test programs according to unique enterprise testing conditions. Full offline operation training covering equipment operation, software programming and basic troubleshooting is provided after equipment delivery. Full-lifecycle managed services include annual on-site precision calibration, 24-hour emergency malfunction repair, upgrade and replacement of old instruments, rental hosting of idle testing equipment. A 7×12-hour online technical support hotline is available, and engineers can arrive on-site within 24 hours to handle critical production line faults.
Multiple leading domestic household and industrial & commercial energy storage manufacturers have deployed Bidipro automated PCS test solutions. After launch, comprehensive production line detection efficiency is improved by over 50%, overall instrument operation and maintenance cost is reduced by 30%, and exported energy storage products can pass IEC international electrical compliance inspection at one time, greatly shortening overseas certification cycles.
If you need complete hardware configuration list, project budget plan or short-term instrument rental quotation for energy storage PCS test systems, please submit your demands on the customized testing solution section of our official website. Dedicated test engineers will contact you within 1 hour.
Scattered instrument splicing has become outdated for energy storage industry testing. Adhering to the development path of service-oriented brand, Bidipro delivers integrated PCS testing implementation solutions including hardware & software matching plus full-lifecycle operation and maintenance hosting, helping energy storage production lines and R&D labs operate efficiently and compliantly.